Sinergy monitors European Family Holiday Group | <Newer | Older> |
Sinergy was called in to survey the sites’ electrical demand/usage over a four week period when the facilities were operating at near maximum capacity. Sinergy was selected for a number of reasons, one of the most important being that it could install enough portable energy loggers to complete a parallel monitoring exercise on the 40-plus distribution transformers. It was also imperative that sub-metering could take place without turning off the power supply to any facilities.
The easiest way to measure load current on the distribution transformers was on outgoing cables where safe access was available. It is common for these phase cables to be run in parallel pairs or sets of three or four. However the span of the cables did not cause installation problems – Sinergy e-Tracker’s flexible CT’s were long enough to span the parallel conductors. The e-Trackers were magnetically clamped to the transformer casings.
A 3 phase voltage measurement reference was accurately derived via Sinergy’s EV-TRAC synthesizer. The EV-TRAC plugs into a single phase socket and has an electrostatic phase identity feature essential in this style of measurement. Some manufacturers rely on their instruments’ software to automatically sort out the phase identity and rotation. This can be unreliable and lead to measurement inaccuracies. For example, if the power factor of one phase falls below about 0.7, then to some existing software algorithm, this phase appears more like the adjacent phase.
The peak demand of 500kW at 10.30pm on the 15th had a significant effect on the site’s monthly Maximum Demand charge and annual Capacity Charge. These two elements can represent up to 25% of an electricity bill. The question was whether peak demands at other distribution transformers coincided to push the 500kW level two or three times higher. The Excel uplink within e-Tracker’s Deltrax software package enables cumulative additions and comparisons with other sites to be made. However the solutions to seemingly complex questions are often easy – disable some equipment for the night and use e-Tracker to determine what effect it has on the profile and most importantly. Deltrax should display an improvement and its tariff section will work out the appropriate cost saving.
![]() |
TOP | ![]() |